Whitchurch Biogas

Project Details

Our project work at Whitchurch Biogas in Shropshire includes the specification, design, installation and commissioning of the site.

We’ve installed 4 Jenbacher CHP engines totalling 2.5MW, a CHP waste heat recovery system totalling 2.4MW and installed on on-site LV network.

Advantage Biogas will also manage the full operations and maintenance of the plant including CHPs and the provision of an on-site TCM (Technically Competent Manager).

< Back